Commercial / Industrial

Commercial / Industrial

Name: Blackpole Industrial Estate

Location: Worcester

Value: £3.6M

Client: Chartwell Land Development Ltd

Architect: Whicheloe Macfarlane

Role:
Structural design of substructure, external works and below ground drainage

Description: This was a design build contract with CNM's direct client being Kier Moss, Cheltenham. The site was previously a factory on the outskirts of Worcester, following demolition of the original building CNM devised the ground engineering necessary to re-use the vast majority of the reclaimed crushed brick and hardcore as sub-base for the main retail units so providing a cost effective and sustainable solution.

The development provided circa 8000m ? of retail space with associated service yards and car parking. A special feature of the development was the inclusion of a linear Art Feature to one side of the car park adding both a screening affect to the adjoining industrial park and a visual amenity for local residents. CNM worked very closely with the sculptor to provide reinforced concrete foundations for the large steel up-stand panels arranged to represent a mountain range.

Quadrant Distribtion Centre Roads

Name: Quadrant Distribution Centre (Phase 2)

Location: Quedgeley, Gloucester

Architect: PRC

Value: £4.5M

Client: Kier Moss D&B for Ashtenne

Role: Full civil/structural design including underground drainage and new estate road

Description: Following on from Phase 1 Development of a former RAF base including the construction of 15No. New Units with external yards, new estate road and SUDS drainage system for adoption

Brize Norton 2

Name: FSTA Training Building

Location: Brize Norton

Value: Confidential

Client:

Architect: CT+G London

Role: Full structural and drainage design

Description: To follow